Storage Project

Client: Deep Rock Tanks LLC and Gavilon Pipeline and Storage, LLC
Location: Cushing, OK
Recordable safety incidents: 0

Scope of work

Matrix Service was selected to complete a terminal construction project which consisted of two 50,000 bbl and sixteen 250,000 bbl open top tanks for crude storage with a total capacity of 4.1 million barrels.

Scope of work included:

  • Installation of foundations
  • Procurement
  • Fabrication
  • Field erection
  • Hydro testing

Terminal engineering was performed by Matrix Service’s sister company, Matrix PDM Engineering, including the mechanical and electrical design and process design of the terminal.

The team invested more than 124,000 man-hours with an outstanding safety performance throughout the duration ending with zero recordable incidents.